摘要
本设计矿井的井田面积为29.96平方千米,年产量300万吨。井田内煤层赋存比较稳定,煤层倾角,平均3°,煤层厚度平均8.0m。井田范围内整体地质条件比较简单,断层较发育,但均是小断层。矿井瓦斯含量较高,为高瓦斯矿井,矿井涌水量不大。根据实际的地质资料情况进行井田开拓和准备方式的初步设计,该矿井决定采用双斜井两水平上下山开采,采用带区式开拓方式。设计采用综合机械化放顶煤回采工艺,倾斜长壁采煤法,用全部跨落法处理采空区,并对矿井运输、提升、排水和通风等各个生产系统的设备选型计算,以及对矿井安全技术措施和环境保护提出要求,完成了整个矿井的初步设计。矿井全部实现机械化,采用先进技术和借鉴已实现高产高效现代化矿井的经验,实现一矿一面高产高效矿井从而达到良好的经济效益和社会效益。
关键词:倾斜长壁放顶煤综合机械化高产高效
Abstract
These desig
ned allotme
nt area for 29.96 square kilometers,Yearly Output three-hu
ndred trillio
n. Allotme
nt i
ntri
nsically ocurre
nce of coal seam compare stabilize,coal seam pitch is u
nder fiftee
n acid,average coal seam pitch is three acid.Coal seam thick is 8.0m,i
ntegrally
nature co
nditio
n compare simplicity,at allotme
nt scope east
normalizi
ng fu
nctio
n of the stomach a
nd plee
n ce
nter equal have got dislocatio
n upgrowth. Both metha
ne a
nd carbo
n dioxide co
nte
nt relatively do
not high, a
nd
neither do i
nflow of water
no large either. O
n the basis of Prelimi
nary Desig
n,said shaft opt i
n adopt three vertical shaft fluctuate mou
ntai
n exploitatio
n,coal seam groupi
ng ba
nd regio
n fluctuate mou
ntai
n co- disposal 'mode of ope
ni
ng,desig
n adopt comprehe
nsive mecha
nizatio
n full-seam mi
ni
ng stopper art,i
ncli
ne lo
ngwall method,treat goaf with whole straddle alight law from actual geologic i
nformatio
n i
nsta
nce proceed allotme
nt exploit a
nd sta
nd-by mode. The Prelimi
nary Desig
n of the both both combi
ne versus mi
ne haul, shaft exaltatio
n, shaft drai
n a
nd ve
ntilatio
n of mi
nes isopua
nt systemic equipme
nt lectotype cou
nt,as well as versus shaft tech
nical safety measures a
nd e
nviro
nme
ntal protectio
n claim,complete wholly shaft. Both shaft whole realize mecha
nizatio
n,adopt adva
nced tech
niques a
nd use for refere
nce afterwards realize high yield highly active moder
nizatio
n shaft 'experie
nce,realize o
ne mi
ne
not both high yield highly active shaft thereby ru
n up to favorable eco
nomic be
nefit a
nd social be
nefit. Keyword:i
ncli
ne le
ngth wall full-seam mi
ni
ng comprehe
nsive mecha
nizatio
n high yield highly active 目录 前言1 1矿井概况及井田地质特征2 1.1井田位置和交通条件2 1.2自然地理3 1.3井田地质特征及煤性分析4 2矿井储量、年产量及服务年限10 2.1井田境界10 2.2井田储量10 2.3矿井年产量及服务年限16 3矿井开拓18 3.1概述18 3.2井田开拓18 3.3井筒特征26 3.4井底车场31 3.5开采顺序及采区回采工作面的配置41 3.6井巷工程量和建井周期44 4采煤方法47 4.1采煤方法的选择47 4.2采区巷道布置及生产系统47 4.3回采工艺设计52 5矿井运输、提升及排水56 5.1矿井运输56 5.2矿井提升60 5.3矿井排水67 6矿井通风与安全技术措施78 6.1矿井通风系统的选择78 6.2风量计算及风量分配79 6.3全矿通风阻力计算83 6.4扇风机选型87 6.5矿井安全技术措施90 7矿山环保93 7.1矿山污染源概述93 7.2矿山污染源的防治94 结论95 致谢97 参考文献99 前言 本次设计是根据在某煤矿进行的实习中所收集的矿井地质资料,依据指导教师布置的题目,在教师的精心指导下,对矿井进行的初步设计。 采矿工程设计是采矿工程专业全部教学进程中的最后一个环节。作为对大学生在学校的最后一次综合性的知识技能考查,它综合地考查了学生这四年来对基础知识及其专业知识的掌握情况,使学生学会自我思考、自行设计。在设计过程中,把所学的理论知识与实践经验结合起来应用。这样达到了对理论知识“温故而知新“的作用,同时也学到了一些实际生产过程中的经验。 设计的过程就是一个不断认识和学习的过程。在本次设计过程中,认真贯彻《矿产资源法》、《煤炭法煤炭工业技术政策》、《煤炭安全规程》、《煤炭工业矿井设计规范》以及国家其它发展煤炭工业的方针政策,积极采用切实可行高产高效的先进技术与工艺,力争使自己的设计成果达到较高水平。
展开...
ned allotme
nt area for 29.96 square kilometers,Yearly Output three-hu
ndred trillio
n. Allotme
nt i
ntri
nsically ocurre
nce of coal seam compare stabilize,coal seam pitch is u
nder fiftee
n acid,average coal seam pitch is three acid.Coal seam thick is 8.0m,i
ntegrally
nature co
nditio
n compare simplicity,at allotme
nt scope east
normalizi
ng fu
nctio
n of the stomach a
nd plee
n ce
nter equal have got dislocatio
n upgrowth. Both metha
ne a
nd carbo
n dioxide co
nte
nt relatively do
not high, a
nd
neither do i
nflow of water
no large either. O
n the basis of Prelimi
nary Desig
n,said shaft opt i
n adopt three vertical shaft fluctuate mou
ntai
n exploitatio
n,coal seam groupi
ng ba
nd regio
n fluctuate mou
ntai
n co- disposal 'mode of ope
ni
ng,desig
n adopt comprehe
nsive mecha
nizatio
n full-seam mi
ni
ng stopper art,i
ncli
ne lo
ngwall method,treat goaf with whole straddle alight law from actual geologic i
nformatio
n i
nsta
nce proceed allotme
nt exploit a
nd sta
nd-by mode. The Prelimi
nary Desig
n of the both both combi
ne versus mi
ne haul, shaft exaltatio
n, shaft drai
n a
nd ve
ntilatio
n of mi
nes isopua
nt systemic equipme
nt lectotype cou
nt,as well as versus shaft tech
nical safety measures a
nd e
nviro
nme
ntal protectio
n claim,complete wholly shaft. Both shaft whole realize mecha
nizatio
n,adopt adva
nced tech
niques a
nd use for refere
nce afterwards realize high yield highly active moder
nizatio
n shaft 'experie
nce,realize o
ne mi
ne
not both high yield highly active shaft thereby ru
n up to favorable eco
nomic be
nefit a
nd social be
nefit. Keyword:i
ncli
ne le
ngth wall full-seam mi
ni
ng comprehe
nsive mecha
nizatio
n high yield highly active 目录 前言1 1矿井概况及井田地质特征2 1.1井田位置和交通条件2 1.2自然地理3 1.3井田地质特征及煤性分析4 2矿井储量、年产量及服务年限10 2.1井田境界10 2.2井田储量10 2.3矿井年产量及服务年限16 3矿井开拓18 3.1概述18 3.2井田开拓18 3.3井筒特征26 3.4井底车场31 3.5开采顺序及采区回采工作面的配置41 3.6井巷工程量和建井周期44 4采煤方法47 4.1采煤方法的选择47 4.2采区巷道布置及生产系统47 4.3回采工艺设计52 5矿井运输、提升及排水56 5.1矿井运输56 5.2矿井提升60 5.3矿井排水67 6矿井通风与安全技术措施78 6.1矿井通风系统的选择78 6.2风量计算及风量分配79 6.3全矿通风阻力计算83 6.4扇风机选型87 6.5矿井安全技术措施90 7矿山环保93 7.1矿山污染源概述93 7.2矿山污染源的防治94 结论95 致谢97 参考文献99 前言 本次设计是根据在某煤矿进行的实习中所收集的矿井地质资料,依据指导教师布置的题目,在教师的精心指导下,对矿井进行的初步设计。 采矿工程设计是采矿工程专业全部教学进程中的最后一个环节。作为对大学生在学校的最后一次综合性的知识技能考查,它综合地考查了学生这四年来对基础知识及其专业知识的掌握情况,使学生学会自我思考、自行设计。在设计过程中,把所学的理论知识与实践经验结合起来应用。这样达到了对理论知识“温故而知新“的作用,同时也学到了一些实际生产过程中的经验。 设计的过程就是一个不断认识和学习的过程。在本次设计过程中,认真贯彻《矿产资源法》、《煤炭法煤炭工业技术政策》、《煤炭安全规程》、《煤炭工业矿井设计规范》以及国家其它发展煤炭工业的方针政策,积极采用切实可行高产高效的先进技术与工艺,力争使自己的设计成果达到较高水平。