祁东煤矿1.2 Mt/a新井设计
摘要
本设计包括三个部分:一般部分、专题部分和翻译部分。
一般部分为祁东矿1.2Mt/a新井设计。祁东矿位于安徽省宿州市东南,交通便利。井田走向(东西)长约9.2km,倾向(南北)长约5.0km,井田总面积约35.4km2。主采煤层为61#煤,倾角10~15°,平均14°。煤层平均厚度为3.6 m。井田地质条件较为简单。
井田工业储量为122.02Mt,矿井可采储量98.6Mt。矿井服务年限为63.21a,涌水量不大,矿井正常涌水量为234m3/h,最大涌水量为360m3/h。矿井相对瓦斯涌出量为12.76 m3/t,为高瓦斯矿井。
井田为立井两水平开拓。大巷采用胶带运输机运煤,辅助运输采用矿车运输。矿井通风方式为两翼对角式通风。
矿井年工作日为330 d,工作制度为“三八”制。
一般部分共包括10章:1.矿区概述及井田地质特征;2.井田境界和储量;3.矿井工作制度、设计生产能力及服务年限;4.井田开拓;5.准备方式——采区巷道布置;6.采煤方法;7.井下运输;8.矿井提升;9.矿井通风与安全;10.矿井基本技术经济指标。
专题部分题目为浅谈祁东矿6201工作面瓦斯抽采治理技术。
翻译部分题目为极深条件下的高效长壁采煤。
关键词:立井开拓,暗斜井延伸,两翼对角式通风。
ABSTRACT
The three parts is i
ncluded i
n this desig
n,i.e.,the ge
neral part, special subject part a
nd tra
nslatio
n. The ge
neral part is a
new desig
n of QiDo
ng mi
ne with a productio
n of 1.2 millio
n t/a. QiDo
ng mi
ne li
nes i
n the southeast of SuZhou Cou
nty, A
nHui provi
nce. The traffic of road a
nd railway is very co
nve
nie
nce to the mi
ne. The ru
n of the mi
nefield is 9.2 km ,the width is about 5.0 km, well farmla
nd total area is 35.4 km2. No. 61 is the mai
n coal seam, a
nd its dip a
ngle is 10~15°, 14° for average. The thick
ness of the mi
ne is about 3.6m respectively. The geological co
nditio
ns of the mi
nefield is relatively simple. The proved reserve of the mi
nefield is 122.02 Mt. The recoverable reserve is 98.6 Mt. The desig
ned productive capacity is 1.2 Mt/a, a
nd the service life of the mi
ne is 63.21 years. The
normal water flow of the mi
ne is 234 m3/h a
nd the max flow of the mi
ne is 360 m3/h. The relative gas emissio
n rate of the mi
neral well is 12.76 m3/t, for high gas mi
neral well. The well farmla
nd is a double-level with a shaft to expa
nd. The coal is tra
nsported by the belt co
nveyer i
n the mai
n roadway a
nd 1 t mi
ne car is used as the auxiliary tra
nsportatio
n equipme
nt. The way of mi
ne ve
ntilatio
n is two wi
ng opposite a
ngle type. The worki
ng system “three-eight” is used i
n Qido
ng mi
ne. It produces 330d/a. This ge
neral part i
ncludes te
n chapters: 1.A
n outli
ne of the mi
ne field geology; 2.Bou
ndary a
nd the reserves of mi
ne; 3.The service life a
nd worki
ng system of mi
ne; 4.Developme
nt e
ngi
neeri
ng of coalfield; 5.The layout of pa
nels; 6. The method used i
n coal mi
ni
ng; 7. Tra
nsportatio
n of the u
ndergrou
nd; 8.The lifti
ng of the mi
ne; 9. The ve
ntilatio
n a
nd the safety operatio
n of the mi
ne; 10.The basic eco
nomic a
nd tech
nical
norms. Special subject part of topics is: O
n the extractio
n treatme
nt tech
nology for gas of the 6201 fully mecha
nized cavi
ng face i
n Qido
ng mi
ne. The title of the tra
nslatio
n part is: High performa
nce lo
ngwall extractio
n i
n large depth. Keywords:vertical developme
nt; i
nside slope developme
nt; two wi
ng opposite a
ngle type ve
ntilatio
n 目录 1矿井概述及井田地质特征5 1.1矿区概述5 1.1.1矿区地理位置、范围5 1.1.2交通条件5 1.1.3地形、地貌5 1.1.4工农业生产情况5 1.1.5矿区气候5 1.2井田地质特征6 1.2.1井田地质条件6 1.2.2地质综合柱状图6 1.2.3含煤地层8 1.3煤层特征10 1.3.1煤层埋藏条件10 1.3.2煤层群的层数10 1.3.3煤层的围岩性质11 1.3.4煤的特征12 2井田境界和储量13 2.1井田境界13 2.2矿井储量计算13 2.2.1构造类型13 2.2.2储量级别与计算块段的划分13 2.2.3矿井可采储量15 2.2.4工业广场煤柱16 3矿井工作制度、设计生产能力及服务年限18 3.1矿井工作制度18 3.2矿井设计生产能力及服务年限18 3.2.1确定依据18 3.2.2矿井设计生产能力18 3.2.3矿井服务年限18 3.3井型校核19 4井田开拓20 4.1井田开拓的基本问题20 4.1.1井筒形式和位置的确定20 4.1.2采区划分22 4.1.3工业场地的位置22 4.1.4开采水平的确定23 4.1.5井底车场和运输大巷的布置23 4.1.6矿井开拓延伸及深部开拓方案23 4.1.7开采顺序24 4.1.8矿井开拓方案比较24 4.2矿井基本巷道33 4.2.1井筒33 4.2.2井底车场及硐室36 4.2.3主要开拓巷道39 5准备方式—采区巷道布置43 5.1煤层地质特征43 5.1.1采区位置43 5.1.2采区煤层特征43 5.1.3煤层顶底板岩石构造情况43 5.1.4水文地质43 5.1.5地质构造43 5.1.6地表情况43 5.2采区巷道布置及生产系统43 5.2.1采区准备方式的确定43 5.2.2采区巷道布置44 5.2.3采区生产系统45 5.2.4采区内巷道掘进方法46 5.2.5采区生产能力及采出率47 5.2.6采区准备巷道47 5.3采区车场选型设计49 5.3.1采区上部车场选型49 5.3.2采区中部车场选型49 5.3.3采区下部车场选型50 5.3.4采区主要硐室50 6采煤方法52 6.1采煤工艺方式52 6.1.1采区煤层特征及地质条件52 6.1.2确定采煤工艺方式52 6.1.3回采工作面长度的确定52 6.1.4工作面的推进方向和推进度52 6.1.5综采工作面的设备选型及三机配套52 6.1.6各工艺过程注意事项59 6.1.7工作面端头支护和超前支护60 6.1.8循环图表、劳动组织、主要技术经济指标61 6.1.9综采机械化采煤过程中应注意事项65 6.2回采巷道布置66 6.2.1回采巷道布置方式66 6.2.2回采巷道参数66 7井下运输68 7.1概述68 7.1.1矿井设计生产能力及工作制度68 7.1.2煤层及煤质68 7.1.3运输距离和辅助运输设计68 7.1.4矿井运输系统68 7.2采区运输设备选择69 7.2.1设备选型原则69 7.2.2采区运输设备选型及能力验算70 7.3大巷运输设备选型71 7.3.1运输大巷设备选择71 7.3.2轨道大巷设备选择71 7.3.3运输设备能力验算73 8矿井提升74 8.1矿井提升概述74 8.2主副井提升74 8.2.1主井提升74 8.2.2副井提升76 9矿井通风及安全78 9.1矿井地质、开拓、开采概况78 9.1.1矿井地质概况78 9.1.2开拓方式78 9.1.3开采方法78 9.1.4变电所、充电硐室、火药库78 9.1.5工作制、人数78 9.2矿井通风系统的确定79 9.2.1矿井通风系统的基本要求79 9.2.2矿井通风方式的选择80 9.2.3矿井通风方法的选择80 9.2.4采区通风系统的要求81 9.2.5回采工作面通风方式的选择82 9.3矿井风量计算及风量分配82 9.3.1选择通风系统的原则和方法82 9.3.2配风依据83 9.3.3风量计算83 9.3.4风量分配与风速验算86 9.4矿井通风阻力88 9.4.1矿井最大阻力路线88 9.4.2矿井通风阻力计算88 9.4.3矿井通风总阻力89 9.4.4两个时期的矿井总风阻和总等积孔89 9.5矿井通风设备选型90 9.5.1选择主要通风机的基本原则90 9.5.2通风机风压的确定91 9.5.3电动机选型92 9.5.4对矿井主要通风设备的要求92 9.5.5对反风风硐的要求93 9.6矿井灾害的防治措施93 9.6.1瓦斯管理措施93 9.6.2煤尘的防治93 9.6.3防火94 9.6.4防水94 10设计矿井基本技术经济指标97 参考文献99 致谢100
展开...
ncluded i
n this desig
n,i.e.,the ge
neral part, special subject part a
nd tra
nslatio
n. The ge
neral part is a
new desig
n of QiDo
ng mi
ne with a productio
n of 1.2 millio
n t/a. QiDo
ng mi
ne li
nes i
n the southeast of SuZhou Cou
nty, A
nHui provi
nce. The traffic of road a
nd railway is very co
nve
nie
nce to the mi
ne. The ru
n of the mi
nefield is 9.2 km ,the width is about 5.0 km, well farmla
nd total area is 35.4 km2. No. 61 is the mai
n coal seam, a
nd its dip a
ngle is 10~15°, 14° for average. The thick
ness of the mi
ne is about 3.6m respectively. The geological co
nditio
ns of the mi
nefield is relatively simple. The proved reserve of the mi
nefield is 122.02 Mt. The recoverable reserve is 98.6 Mt. The desig
ned productive capacity is 1.2 Mt/a, a
nd the service life of the mi
ne is 63.21 years. The
normal water flow of the mi
ne is 234 m3/h a
nd the max flow of the mi
ne is 360 m3/h. The relative gas emissio
n rate of the mi
neral well is 12.76 m3/t, for high gas mi
neral well. The well farmla
nd is a double-level with a shaft to expa
nd. The coal is tra
nsported by the belt co
nveyer i
n the mai
n roadway a
nd 1 t mi
ne car is used as the auxiliary tra
nsportatio
n equipme
nt. The way of mi
ne ve
ntilatio
n is two wi
ng opposite a
ngle type. The worki
ng system “three-eight” is used i
n Qido
ng mi
ne. It produces 330d/a. This ge
neral part i
ncludes te
n chapters: 1.A
n outli
ne of the mi
ne field geology; 2.Bou
ndary a
nd the reserves of mi
ne; 3.The service life a
nd worki
ng system of mi
ne; 4.Developme
nt e
ngi
neeri
ng of coalfield; 5.The layout of pa
nels; 6. The method used i
n coal mi
ni
ng; 7. Tra
nsportatio
n of the u
ndergrou
nd; 8.The lifti
ng of the mi
ne; 9. The ve
ntilatio
n a
nd the safety operatio
n of the mi
ne; 10.The basic eco
nomic a
nd tech
nical
norms. Special subject part of topics is: O
n the extractio
n treatme
nt tech
nology for gas of the 6201 fully mecha
nized cavi
ng face i
n Qido
ng mi
ne. The title of the tra
nslatio
n part is: High performa
nce lo
ngwall extractio
n i
n large depth. Keywords:vertical developme
nt; i
nside slope developme
nt; two wi
ng opposite a
ngle type ve
ntilatio
n 目录 1矿井概述及井田地质特征5 1.1矿区概述5 1.1.1矿区地理位置、范围5 1.1.2交通条件5 1.1.3地形、地貌5 1.1.4工农业生产情况5 1.1.5矿区气候5 1.2井田地质特征6 1.2.1井田地质条件6 1.2.2地质综合柱状图6 1.2.3含煤地层8 1.3煤层特征10 1.3.1煤层埋藏条件10 1.3.2煤层群的层数10 1.3.3煤层的围岩性质11 1.3.4煤的特征12 2井田境界和储量13 2.1井田境界13 2.2矿井储量计算13 2.2.1构造类型13 2.2.2储量级别与计算块段的划分13 2.2.3矿井可采储量15 2.2.4工业广场煤柱16 3矿井工作制度、设计生产能力及服务年限18 3.1矿井工作制度18 3.2矿井设计生产能力及服务年限18 3.2.1确定依据18 3.2.2矿井设计生产能力18 3.2.3矿井服务年限18 3.3井型校核19 4井田开拓20 4.1井田开拓的基本问题20 4.1.1井筒形式和位置的确定20 4.1.2采区划分22 4.1.3工业场地的位置22 4.1.4开采水平的确定23 4.1.5井底车场和运输大巷的布置23 4.1.6矿井开拓延伸及深部开拓方案23 4.1.7开采顺序24 4.1.8矿井开拓方案比较24 4.2矿井基本巷道33 4.2.1井筒33 4.2.2井底车场及硐室36 4.2.3主要开拓巷道39 5准备方式—采区巷道布置43 5.1煤层地质特征43 5.1.1采区位置43 5.1.2采区煤层特征43 5.1.3煤层顶底板岩石构造情况43 5.1.4水文地质43 5.1.5地质构造43 5.1.6地表情况43 5.2采区巷道布置及生产系统43 5.2.1采区准备方式的确定43 5.2.2采区巷道布置44 5.2.3采区生产系统45 5.2.4采区内巷道掘进方法46 5.2.5采区生产能力及采出率47 5.2.6采区准备巷道47 5.3采区车场选型设计49 5.3.1采区上部车场选型49 5.3.2采区中部车场选型49 5.3.3采区下部车场选型50 5.3.4采区主要硐室50 6采煤方法52 6.1采煤工艺方式52 6.1.1采区煤层特征及地质条件52 6.1.2确定采煤工艺方式52 6.1.3回采工作面长度的确定52 6.1.4工作面的推进方向和推进度52 6.1.5综采工作面的设备选型及三机配套52 6.1.6各工艺过程注意事项59 6.1.7工作面端头支护和超前支护60 6.1.8循环图表、劳动组织、主要技术经济指标61 6.1.9综采机械化采煤过程中应注意事项65 6.2回采巷道布置66 6.2.1回采巷道布置方式66 6.2.2回采巷道参数66 7井下运输68 7.1概述68 7.1.1矿井设计生产能力及工作制度68 7.1.2煤层及煤质68 7.1.3运输距离和辅助运输设计68 7.1.4矿井运输系统68 7.2采区运输设备选择69 7.2.1设备选型原则69 7.2.2采区运输设备选型及能力验算70 7.3大巷运输设备选型71 7.3.1运输大巷设备选择71 7.3.2轨道大巷设备选择71 7.3.3运输设备能力验算73 8矿井提升74 8.1矿井提升概述74 8.2主副井提升74 8.2.1主井提升74 8.2.2副井提升76 9矿井通风及安全78 9.1矿井地质、开拓、开采概况78 9.1.1矿井地质概况78 9.1.2开拓方式78 9.1.3开采方法78 9.1.4变电所、充电硐室、火药库78 9.1.5工作制、人数78 9.2矿井通风系统的确定79 9.2.1矿井通风系统的基本要求79 9.2.2矿井通风方式的选择80 9.2.3矿井通风方法的选择80 9.2.4采区通风系统的要求81 9.2.5回采工作面通风方式的选择82 9.3矿井风量计算及风量分配82 9.3.1选择通风系统的原则和方法82 9.3.2配风依据83 9.3.3风量计算83 9.3.4风量分配与风速验算86 9.4矿井通风阻力88 9.4.1矿井最大阻力路线88 9.4.2矿井通风阻力计算88 9.4.3矿井通风总阻力89 9.4.4两个时期的矿井总风阻和总等积孔89 9.5矿井通风设备选型90 9.5.1选择主要通风机的基本原则90 9.5.2通风机风压的确定91 9.5.3电动机选型92 9.5.4对矿井主要通风设备的要求92 9.5.5对反风风硐的要求93 9.6矿井灾害的防治措施93 9.6.1瓦斯管理措施93 9.6.2煤尘的防治93 9.6.3防火94 9.6.4防水94 10设计矿井基本技术经济指标97 参考文献99 致谢100
作品编号:
151993
文件大小:
6.66MB
下载积分:
1000
文件统计:
doc文件4个,dwg文件5个
文件列表
正在加载...请等待或刷新页面...