沉阳市某小区高层住宅楼供暖及换热站设计含5张CAD图+说明书
摘要 随着美丽中国的口号的提出,节能减排在建设和谐社会中的推广和实施,集中供暖相对于局部供暖显示了巨大优势,分户热计量更是受到很大关注。 本课题就对沉阳高层建筑集中供暖系统的设计,熟悉供暖设计的程序、内容和基本原则,学习设计的方法步骤,进一步提高运算、制图和使用资料的能力,巩固所学的知识,培养这些知识解决设计问题的能力。 在设计中,通过对设计情况的了解,确定建筑物的热负荷,供暖系统形式的选择,水力计算和校核计算;以及建筑物的平面图和系统原理图。 设计中采用的是采用机械循环、双管制垂直式的上供下回系统。钢制柱式800×600,散热片安装形式为异侧的上供下回,供水立管之间为异程式,户内系统为水平单管顺流式。设计供回水温度为85/60℃。 换热站的设计主要包括设备的布置,定位尺寸确定,换热器的选型,循环水泵,补给水泵的选型及辅助设备的选择计算。 设计说明书中附有所有计算的数据。 关键词:分户热计量散热器机械循环单管顺流热负荷 abstract With the beautiful Chi
nese sloga
ns are put forward a
nd the e
nergy co
nservatio
n a
nd emissio
n reductio
n i
n the co
nstructio
n of harmo
nious society, a
nd promote a
nd impleme
nt co
nce
ntrated heati
ng relative to the local heati
ng showed great adva
ntage. Household heat meteri
ng is u
nder great atte
ntio
n This topic is a twe
nty- five layers of She
n ya
ng buildi
ng desig
n of ce
ntral heati
ng system with heati
ng desig
n, program, co
nte
nt a
nd basic pri
nciples, methods a
nd steps of the lear
ni
ng desig
n, improve operatio
n a
nd use of drawi
ng a
nd data, co
nsolidate the k
nowledge, cultivati
ng the ability of solvi
ng desig
n problems. I
n the desig
n, through the desig
n of buildi
ngs, determi
ne the thermal load, the choice of the form of heati
ng systems, hydraulic calculatio
n a
nd check calculatio
n, A
nd the buildi
ng pla
n a
nd system diagram. Desig
n is adopted by the mecha
nical circulatio
n, dual co
ntrol system of vertical purificatio
n
next.I
n the desig
n we used Steel colum
n radiator 800×600, radiator for i
nstallatio
n of the opposite offer
next. Water is made betwee
n tube with a program, i
n the bottom water pipe with roots i
n process. Choose the outside buildi
ng600×600 body i
n a separate room for the equipme
nt room, placed betwee
n pump a
nd heat excha
nger, i
ndoor system for horizo
ntal si
ngle pipe dow
nstream. Desig
n for the retur
n water temperature to 85/60 degrees. Heat excha
nge statio
n desig
n mai
nly i
ncludes the equipme
nt layout, positio
ni
ng to determi
ne size, selectio
n of heat excha
nger, circulati
ng pump, make-up pump type selectio
n a
nd the selectio
n of auxiliary equipme
nt calculatio
n. This desig
n specificatio
n i
ncludi
ng all calculatio
n data. Key words: Household heat meteri
ng machi
ne cycle si
ngle pipe dow
nstream thermal load 目录 引言3 第1章设计概况4 1.1工程名称4 1.2地理位置4 1.3建筑概况4 1.4建筑条件4 1.4.1建筑物层高4 1.4.2围护结构热工计算参数4 1.4.3热源条件4 1.4.4设计内容4 第2章采暖热负荷计算5 2.1采暖热负荷计算原理5 2.1.1围护结构基本热负荷5 2.1.2围护结构的附加(修正)耗热量6 2.1.3冷风渗透耗热量7 2.1.4冷风侵入耗热量9 2.2某小区采暖热负荷计算9 2.2.1某小区的室外气象参数9 2.2.2室内不同类型房间的设计温度9 2.2.3热负荷计算9 第3章散热设备的计算与选取13 3.1散热设备的选取13 3.1.1散热器选取的规定13 3.1.2散热器布置的注意事项13 3.2散热器选型计算14 3.2.1散热器的选型计算原理14 3.2.2房间的散热器计算结果15 第4章水力计算17 4.1.1管路形式的选择17 4.1.2管路布置与敷设17 4.2系统水力计算步骤17 4.2.1支管的水利计算步骤: 17 4.2.2对单元立管进行水利计算18 4.2.3:不平衡率的计算。 19 第五章换热站设计21 5.1换热器的选择与计算21 5.2水泵和水处理设备的选择与计算22 2、补给水泵23 5.3、水处理设施选择23 5.4其它设备选择23 5.5:换热站内各条管路管径选择. 24 总结26 致谢27 参考文献28
展开...
作品编号: 150265
文件大小: 2.27MB
下载积分: 1000
文件统计: doc文件2个,dwg文件1个,xls文件3个
正在加载...请等待或刷新页面...

热门搜索

相关推荐

© 机械5 访问电脑版